Integrated Solar-Storage-Charging Project at a Logistics Park in Jakarta, Indonesia

An LVK 522kWh energy storage cabinet paired with carport rooftop solar and DC fast-charging piles at a Jakarta logistics park, featuring a 250kW STS module for millisecond-level grid-to-island transitions.

Location Jakarta, Indonesia
Application Integrated Solar-Storage-Charging (PV + ESS + EV Charging)
System Size 522 kWh
Capacity 522 kWh
Power 250 kW
Commissioning Time Q3 2026
Battery Type LiFePO4
Application Type Integrated Solar-Storage-Charging (PV + ESS + EV Charging)
Delivery Model Turnkey EPC + STS + EMS

Project Overview

Project Background

An LVK 522kWh energy storage cabinet paired with carport rooftop solar and DC fast-charging piles at a Jakarta logistics park, featuring a 250kW STS module for millisecond-level grid-to-island transitions.

Customer Needs

As the park fully adopted electric trucks, simultaneous high-power fast charging by multiple vehicles caused severe instantaneous power surges, leading to frequent transformer overloads and tripping. Furthermore, due to local grid transmission capacity limits, the utility company rejected the park's application for a capacity upgrade.

Application Focus

Integrated Solar-Storage-Charging (PV + ESS + EV Charging)

Solution Design

Integrated ESS Design For Site Operations

LVK tailored a 522kWh integrated solar-storage-charging solution for the park. The system incorporates a 250kW STS (Static Transfer Switch) module, allowing the energy storage system to act as a grid buffer. This resolved the power bottleneck associated with high-power fast charging without requiring a transformer upgrade.

Energy Storage 522 kWh
Power Conversion 250 kW
EMS Control Turnkey EPC + STS + EMS
Battery Safety LiFePO4
Integrated Solar-Storage-Charging Project at a Logistics Park in Jakarta, Indonesia solution equipment

System Architecture

Coordinated Power Flow

522 kWh BESS + 250 kW STS + Carport PV + DC Fast Chargers

Energy Source BESS + PV + EV Charging
EMS Monitoring & dispatch
Battery Cabinet 522 kWh
Site Load Integrated Solar-Storage-Charging (PV + ESS + EV Charging)
DC AC Communication Power Flow

Results & Benefits

Project Outcomes

45%

Green charging costs for the logistics fleet were reduced by 45%.

Outcome 02

Achieved "virtual capacity expansion," eliminating the need for the massive investment and lengthy approval processes associated with applying to the utility for a grid capacity upgrade.

3.1 years

The estimated payback period (ROI) is 3.1 years.