5MWh Solar-Storage-Diesel Hybrid Microgrid Project at a Large Gold Mine in Nigeria

An LVK 5MWh heavy-duty BESS container with 500kW STS and 3MWp PV powering a remote Nigerian gold mine's 24-hour crushing and excavation operations.

Location Northern Nigeria (remote mountainous area)
Application Solar-Storage-Diesel Off-Grid Microgrid
System Size 5 MWh
Capacity 5 MWh
Power 500 kW (STS)
Commissioning Time Q4 2026
Battery Type LiFePO4 (heavy-duty)
Application Type Solar-Storage-Diesel Off-Grid Microgrid
Delivery Model Turnkey EPC + STS + Microgrid EMS

Project Overview

Project Background

An LVK 5MWh heavy-duty BESS container with 500kW STS and 3MWp PV powering a remote Nigerian gold mine's 24-hour crushing and excavation operations.

Customer Needs

The mine is situated in a remote area without grid access, yet heavy-duty crushers and excavation equipment require continuous 24-hour operation. Long-distance diesel transport is costly. Furthermore, the startup and shutdown of heavy equipment generate massive current surges; these frequently caused the diesel generators to trip due to instantaneous overload, resulting in unexpected production shutdowns across the entire mine.

Application Focus

Solar-Storage-Diesel Off-Grid Microgrid

Solution Design

Integrated ESS Design For Site Operations

Deployment of an LVK 5MWh modular heavy-duty energy storage container, featuring an optional 500kW STS (Static Transfer System) at the core power distribution output. Coupled with the EMS scheduling platform, the high-response battery system serves as the core dynamic regulator for the mine's microgrid.

Energy Storage 5 MWh
Power Conversion 500 kW (STS)
EMS Control Turnkey EPC + STS + Microgrid EMS
Battery Safety LiFePO4 (heavy-duty)
5MWh Solar-Storage-Diesel Hybrid Microgrid Project at a Large Gold Mine in Nigeria solution equipment

System Architecture

Coordinated Power Flow

5 MWh Modular Heavy-Duty BESS Container + 500 kW STS + 3 MWp PV + Microgrid EMS

Energy Source BESS + PV + Diesel
EMS Monitoring & dispatch
Battery Cabinet 5 MWh
Site Load Solar-Storage-Diesel Off-Grid Microgrid
DC AC Communication Power Flow

Results & Benefits

Project Outcomes

45%

Successfully reduces annual diesel procurement costs for the gold mine by over 45%.

Outcome 02

Completely eliminates unplanned mine shutdowns caused by severe voltage fluctuations or generator tripping.

3.0 years

Projected payback period (ROI) of just 3.0 years.