Case Studies

4MWh Backup Power Project for a Large Downtown Data Center in Accra, Ghana

An LVK 4MWh fully integrated C&I BESS container with 500kW STS bridging the 10-15 second diesel generator startup gap for a Tier III data center hosting multinational banks and telecom operators in Accra.

Location Accra, Ghana (city center)
Application Data Center Backup Power (Tier III Ride-Through)
System Size 4 MWh
Capacity 4 MWh
Power 500 kW (STS)
Commissioning Time Q4 2026
Battery Type LiFePO4
Application Type Data Center Backup Power (Tier III Ride-Through)
Delivery Model Turnkey EPC + STS + EMS

Project Overview

Project Background

An LVK 4MWh fully integrated C&I BESS container with 500kW STS bridging the 10-15 second diesel generator startup gap for a Tier III data center hosting multinational banks and telecom operators in Accra.

Customer Needs

The center's critical server loads demand extremely high continuity of power supply. However, the local grid is unstable, frequently experiencing instantaneous voltage dips and sudden outages. Although the building is equipped with auto-start diesel generators, there is a 10-to-15-second power vacuum between the moment the diesel engine starts and the time it achieves stable, full-power output.

Application Focus

Data Center Backup Power (Tier III Ride-Through)

Solution Design

Integrated ESS Design For Site Operations

An LVK 4MWh fully integrated C&I energy storage container was deployed. The output power distribution core features a 500kW STS (Static Transfer System), acting as a high-power, seamless transfer hub capable of sub-second response, thereby perfectly bridging the power gap during the diesel generator's startup phase.

Energy Storage 4 MWh
Power Conversion 500 kW (STS)
EMS Control Turnkey EPC + STS + EMS
Battery Safety LiFePO4
4MWh Backup Power Project for a Large Downtown Data Center in Accra, Ghana solution equipment

System Architecture

Coordinated Power Flow

4 MWh Fully Integrated BESS Container + 500 kW STS + Microgrid EMS

Energy Source BESS + Diesel Gensets
EMS Monitoring & dispatch
Battery Cabinet 4 MWh
Site Load Data Center Backup Power (Tier III Ride-Through)
DC AC Communication Power Flow

Results & Benefits

Project Outcomes

100%

Ensured 100% zero downtime and zero data loss for critical server loads at this key West African data center.

10 years

Replaced traditional, highly polluting, and short-lived lead-acid batteries with a system designed for a service life of over 10 years.

4.0 years

Estimated Return on Investment (ROI) period: 4.0 years.