3MWh Hybrid Energy Storage Project for Oilfield Pump Units in Desert, Oman

An LVK 3MWh extreme-high-temperature liquid-cooled BESS container paired with a 500kW STS module and 2.5MW diesel gensets, dynamically smoothing oilfield pump surge loads in the harsh Omani desert interior.

Location Oman (inland desert oilfield zone)
Application Hybrid Energy Storage (Diesel + BESS)
System Size 3 MWh
Capacity 3 MWh
Power 500 kW (STS output)
Commissioning Time Q4 2026
Battery Type LiFePO4 (extreme-high-temp liquid-cooled)
Application Type Hybrid Energy Storage (Diesel + BESS)
Delivery Model Turnkey EPC + EMS + STS

Project Overview

Project Background

An LVK 3MWh extreme-high-temperature liquid-cooled BESS container paired with a 500kW STS module and 2.5MW diesel gensets, dynamically smoothing oilfield pump surge loads in the harsh Omani desert interior.

Customer Needs

The oilfield pump units experience severe, cyclical load fluctuations (characterized by intense instantaneous surges) during operation. To prevent these surge loads from causing generator trips, the diesel generators were previously forced to operate at low efficiency for extended periods, resulting in exorbitant fuel consumption; additionally, the extreme desert heat drove up equipment maintenance costs.

Application Focus

Hybrid Energy Storage (Diesel + BESS)

Solution Design

Integrated ESS Design For Site Operations

A 3MWh outdoor liquid-cooled containerized energy storage system was deployed, featuring a 500kW STS (Static Transfer Switch) module on the heavy-load output side. The system leverages the energy storage unit's high-rate, rapid charge/discharge capabilities and the STS's millisecond-level response time to dynamically smooth out the pump units' surge loads.

Energy Storage 3 MWh
Power Conversion 500 kW (STS output)
EMS Control Turnkey EPC + EMS + STS
Battery Safety LiFePO4 (extreme-high-temp liquid-cooled)
3MWh Hybrid Energy Storage Project for Oilfield Pump Units in Desert, Oman solution equipment

System Architecture

Coordinated Power Flow

3MWh Outdoor Liquid-Cooled BESS Container + 500kW STS + 2.5MW Diesel Hybrid

Energy Source BESS + Diesel Gensets
EMS Monitoring & dispatch
Battery Cabinet 3 MWh
Site Load Hybrid Energy Storage (Diesel + BESS)
DC AC Communication Power Flow

Results & Benefits

Project Outcomes

40%

Successfully reduced diesel fuel procurement costs for the oilfield operations by an average of 40%.

30%

Prevented mechanical wear caused by severe load fluctuations, resulting in a 30% reduction in generator maintenance costs.

2.5 years

The projected payback period (ROI) is only 2.5 years.