Case Studies

2088kWh Electricity Cost Optimization Project for an Electronics Manufacturing Plant, Vietnam

An LVK 2088kWh modular liquid-cooled C&I BESS paired with a hybrid inverter and enterprise EMS, delivering precise peak-shaving and valley-filling for a precision electronics factory in Northern Vietnam.

Location Northern Vietnam (core industrial zone)
Application Peak Shaving & Valley Filling
System Size 2088 kWh
Capacity 2088 kWh
Power TBD
Commissioning Time Q3 2026
Battery Type LiFePO4 (Grade-A, liquid-cooled)
Application Type Peak Shaving & Valley Filling
Delivery Model Turnkey EPC + EMS

Project Overview

Project Background

An LVK 2088kWh modular liquid-cooled C&I BESS paired with a hybrid inverter and enterprise EMS, delivering precise peak-shaving and valley-filling for a precision electronics factory in Northern Vietnam.

Customer Needs

The factory operates multiple high-precision automated production lines that demand exceptional grid voltage stability. Recent hikes in local industrial electricity rates and exorbitant demand charges during peak hours resulted in high operating costs that significantly eroded corporate profits.

Application Focus

Peak Shaving & Valley Filling

Solution Design

Integrated ESS Design For Site Operations

LVK provided a high-safety 2088 kWh C&I energy storage system featuring an optional integrated hybrid inverter. Paired with LVK's proprietary enterprise-grade EMS platform, the system enables the factory to execute precise peak-shaving and valley-filling strategies.

Energy Storage 2088 kWh
Power Conversion TBD
EMS Control Turnkey EPC + EMS
Battery Safety LiFePO4 (Grade-A, liquid-cooled)
2088kWh Electricity Cost Optimization Project for an Electronics Manufacturing Plant, Vietnam solution equipment

System Architecture

Coordinated Power Flow

2088 kWh Modular Liquid-Cooled BESS + Hybrid Inverter + Enterprise EMS

Energy Source BESS (Liquid-Cooled)
EMS Monitoring & dispatch
Battery Cabinet 2088 kWh
Site Load Peak Shaving & Valley Filling
DC AC Communication Power Flow

Results & Benefits

Project Outcomes

48%

Overall electricity operating costs reduced by 48%.

35%

Transformer peak load lowered by 35%, eliminating hefty peak-demand electricity penalties.

2.8 years

Projected payback period (ROI) of just 2.8 years.