1044kWh Microgrid Project for Resort Island, Philippines

An off-grid intelligent microgrid on a tropical Philippine resort island pairing a 1044kWh LVK outdoor BESS with 500kW of existing PV and diesel gensets — cutting diesel use by 55% and delivering zero-noise night power for guests.

Location Philippines (tropical resort island)
Application Off-Grid Intelligent Microgrid
System Size 1044 kWh
Capacity 1044 kWh
Power 500 kW
Commissioning Time Q2 2026
Battery Type LiFePO4
Application Type Off-Grid Intelligent Microgrid
Delivery Model Turnkey EPC + EMS

Project Overview

Project Background

An off-grid intelligent microgrid on a tropical Philippine resort island pairing a 1044kWh LVK outdoor BESS with 500kW of existing PV and diesel gensets — cutting diesel use by 55% and delivering zero-noise night power for guests.

Customer Needs

The island sits far from the mainland grid and historically relied on diesel generators running 24 hours a day. With fuel costs climbing and the diesel sets suffering severe wear during long low-load night periods, the resort faced rising operating costs. Frequent voltage fluctuations also damaged the resort's high-end guest appliances, hurting the guest experience.

Application Focus

Off-Grid Intelligent Microgrid

Solution Design

Integrated ESS Design For Site Operations

LVK provided a customized 1044 kWh modular energy storage container, integrating a 500 kW STS (Static Transfer Switch) module and a microgrid-grade EMS. The system deeply integrates the BESS with the island's existing 500 kW PV array and diesel generators into one coordinated off-grid microgrid.

Energy Storage 1044 kWh
Power Conversion 500 kW
EMS Control Turnkey EPC + EMS
Battery Safety LiFePO4
1044kWh Microgrid Project for Resort Island, Philippines solution equipment

System Architecture

Coordinated Power Flow

1044 kWh Modular BESS + 500 kW STS + Microgrid EMS

Energy Source BESS + PV + Diesel
EMS Monitoring & dispatch
Battery Cabinet 1044 kWh
Site Load Off-Grid Intelligent Microgrid
DC AC Communication Power Flow

Results & Benefits

Project Outcomes

55%

Diesel consumption and fuel procurement costs reduced by 55%.

Outcome 02

Nighttime zero-noise green power across the whole island, significantly boosting guest satisfaction.

3.2 years

Estimated payback period (ROI) of just 3.2 years.