Factory Energy Storage visual

Factory Energy Storage

LVK Energy Storage Cabinet helps factories reduce energy costs, optimize power usage, and ensure stable production with reliable backup power.

  • Peak shaving & demand charge management
  • Backup power for critical loads
  • Improve power quality and reliability
  • Support renewable energy integration

Core Advantages

  • High Safety

    Multi-level safety protection system with active balance, insulation monitoring and thermal management.

  • Modular Design

    Modular structure for flexible expansion and easy maintenance.

  • Intelligent EMS

    AI-powered EMS for real-time monitoring, strategy optimization and remote operation.

  • Fast Deployment

    Prefabricated design for quick installation and easy on-site commissioning.

System Architecture

PV Array
Grid
EMS
Energy Storage Cabinet
Load

How It Works

During off-peak hours or when renewable energy is abundant, the system stores electricity. During peak demand or power outages, it discharges to supply power to critical loads, reducing electricity costs and ensuring uninterrupted production.

  1. Energy Generation

    PV or grid supplies power to the system.

  2. Energy Storage

    Excess energy is stored in the LVK Energy Storage Cabinet.

  3. Energy Discharge

    During peak demand or outage, the system automatically discharges.

  4. Stable & Reliable

    Ensure continuous production and protect critical equipment.

Value Delivered

  • 20-30% Reduce electricity bills through peak shaving.
  • < 10ms Seamless switching ensures uninterrupted power supply.
  • 99.9% High reliability for critical factory operations.
  • CO₂ Lower carbon emissions. Support green factory and sustainability goals.

Real-World Applications

  • Textile Factory
    Textile Factory
  • Automotive Manufacturing
    Automotive Manufacturing
  • Electronics Factory
    Electronics Factory

Project Cases

  • Textile Factory Energy Storage Project

    Textile Factory Energy Storage Project

    Jiangsu, China

    Capacity: 2.15 MWh

    Result: Save 23% electricity costs annually

    View Details
  • Automotive Plant Peak Shaving Project

    Automotive Plant Peak Shaving Project

    Guangdong, China

    Capacity: 1.25 MWh

    Result: Reduce demand charges by 30%

    View Details
  • Electronics Factory Backup Power Project

    Electronics Factory Backup Power Project

    Shenzhen, China

    Capacity: 1.5 MWh

    Result: Zero-power-interruption in 12 months

    View Details