Backup Power visual

Backup Power

LVK BESS provides instant, reliable backup power for critical loads during grid outages, planned maintenance, and unstable grid events.

  • Seamless switchover in milliseconds
  • Ride-through grid events
  • Ride-through planned outages
  • Protect sensitive equipment

Core Advantages

  • Instant Switchover

    Sub-10ms switchover to battery keeps critical loads running without disruption.

  • Ride-Through

    Smooth ride-through of voltage sags, frequency events and momentary outages.

  • Planned Outage

    Replace noisy diesel gen-sets for planned maintenance and tariff window events.

  • Power Quality

    Active filtering cleans harmonics, surges and voltage flickers for sensitive equipment.

System Architecture

Grid
STS / EMS
BESS Cabinet
Critical Load
Diesel Backup

How It Works

The LVK BESS monitors grid quality in real time. The instant a sag or outage is detected, the STS transfers critical loads to battery power within milliseconds — no interruption, no flicker, no reboot.

  1. Grid Normal

    Critical loads are powered by the grid; the BESS floats charged.

  2. Outage Detected

    Voltage sag or outage is detected in milliseconds.

  3. Seamless Transfer

    STS switches loads to the BESS without any interruption.

  4. Grid Restored

    BESS resynchronizes and recharges when the grid returns.

Value Delivered

  • < 10ms Seamless switchover time.
  • 99.999% Critical load availability.
  • 50%+ Reduce diesel runtime for planned events.
  • Quiet Silent operation vs. diesel generator.

Real-World Applications

  • Data Center Backup
    Data Center Backup
  • Hospital Backup
    Hospital Backup
  • Manufacturing Backup
    Manufacturing Backup

Project Cases

  • Data Center Battery Backup

    Data Center Battery Backup

    Beijing, China

    Capacity: 1.0 MWh

    Result: Tier-III backup compliance

    View Details
  • Hospital Critical Load Backup

    Hospital Critical Load Backup

    Sichuan, China

    Capacity: 500 kWh

    Result: Zero-power-interruption in 18 months

    View Details
  • Electronics Factory Backup

    Electronics Factory Backup

    Shenzhen, China

    Capacity: 1.5 MWh

    Result: Zero production-line stoppage

    View Details