LVK BESS provides instant, reliable backup power for critical loads during grid outages, planned maintenance, and unstable grid events.

  • Seamless switchover in milliseconds
  • Ride-through grid events
  • Ride-through planned outages
  • Protect sensitive equipment

Core Advantages

  • Instant Switchover

    Sub-10ms switchover to battery keeps critical loads running without disruption.

  • Ride-Through

    Smooth ride-through of voltage sags, frequency events and momentary outages.

  • Planned Outage

    Replace noisy diesel gen-sets for planned maintenance and tariff window events.

  • Power Quality

    Active filtering cleans harmonics, surges and voltage flickers for sensitive equipment.

System Architecture

Grid
STS / EMS
BESS Cabinet
Critical Load
Diesel Backup

How It Works

The LVK BESS monitors grid quality in real time. The instant a sag or outage is detected, the STS transfers critical loads to battery power within milliseconds — no interruption, no flicker, no reboot.

  1. Grid Normal

    Critical loads are powered by the grid; the BESS floats charged.

  2. Outage Detected

    Voltage sag or outage is detected in milliseconds.

  3. Seamless Transfer

    STS switches loads to the BESS without any interruption.

  4. Grid Restored

    BESS resynchronizes and recharges when the grid returns.

Value Delivered

  • < 10ms Seamless switchover time.
  • 99.999% Critical load availability.
  • 50%+ Reduce diesel runtime for planned events.
  • Quiet Silent operation vs. diesel generator.

Project Cases

  • 1044kWh Solar-plus-Storage Project for a Large Cold Chain Warehouse in Cape Town, South Africa

    1044kWh Solar-plus-Storage Project for a Large Cold Chain Warehouse in Cape Town, South Africa

    Cape Town, South Africa (suburbs)

    Capacity: 1044 kWh

    Result: Reduced the cold chain center's base electricity costs by 52%.

    View Details
  • Virtual Transformer Capacity Expansion for a Commercial Office Building in Dubai, UAE

    Virtual Transformer Capacity Expansion for a Commercial Office Building in Dubai, UAE

    Dubai, UAE

    Capacity: 1044 kWh

    Result: Successfully provided the building with 30% additional usable virtual grid capacity, eliminating the need for costly traditional transformer upgrades.

    View Details
  • 2088kWh Multi-Tenant Industrial Park Capacity Optimization Project in Nairobi, Kenya

    2088kWh Multi-Tenant Industrial Park Capacity Optimization Project in Nairobi, Kenya

    Nairobi, Kenya (outskirts industrial park)

    Capacity: 2088 kWh

    Result: Successfully achieved a virtual expansion of available grid capacity by 35%.

    View Details